How Much Does a 1 MW (1,000 kW) Factory Solar System Cost? (UK 2026)

A 1 MW (1,000 kW) factory solar system costs £650,000–£750,000 fully installed in 2026. That’s £650–£750 per kWp. Year-1 saving: £220,000–£290,000. Payback: 2.5–3 years. Suits large logistics shed, automotive plant, mega-bakery, cold store sites drawing 3,000–5,000 MWh/year.

60-second answer

A 1 MW (1,000 kW) commercial solar PV system in the UK costs £650,000–£750,000 fully installed in 2026. That includes panels, inverters, mounting, structural survey, DNO G99 connection, MCS commercial certification, IWA insurance-backed warranty and commissioning.

  • Cost per kWp installed: £650–£750
  • Number of panels: 1,840 (at 545–625 W each)
  • Roof area required: ~6,000 sqm of unobstructed roof
  • Annual generation: ~920,000 kWh
  • Year-1 saving: £220,000–£290,000 (against current Q1 2026 grid rate of 27.69 p/kWh)
  • Simple payback: 2.5–3 years on capital purchase
  • Tax treatment: 100% AIA in year 1 covers up to £1m of capex — effective post-tax cost £487,500–£562,500

What’s included in the 1MW price

Every line item that goes into the fully-installed price for a UK commercial solar system this size:

  • Panels (Tier-1 TOPCon n-type, e.g. Jinko Tiger Neo 580W or Trina Vertex 605W) — 35–42% of total cost
  • Inverters (Sungrow / Huawei / SMA / Fronius) — 12–15%
  • Mounting and rails (clamp-fix on standing seam, rail-mount on profiled metal, ballasted on flat) — 8–12%
  • DC and AC cabling, isolators, combiners — 5–7%
  • Labour and project management — 12–18%
  • Scaffolding and access — 3–6%
  • Structural survey, electrical design, PVSyst yield modelling — 3–5%
  • DNO G99 connection (application fee, study, connection works) — 4–8%
  • MCS commissioning, IWA warranty, commissioning certificate — 2–4%

The lower end of the price range applies to easy installs — standing seam metal roof, three-phase supply already in place, no grid reinforcement needed. The upper end applies where any of: roof refurbishment is required, single-phase supply needs upgrading, scaffolding is complex, or DNO grid reinforcement adds £15–£75k.

How a 1MW factory solar system pays back

For a typical UK factory operating Mon–Fri 8am–6pm with the load profile that matches a 1 MW (1,000 kW) system, the simple payback runs 2.5–3 years on capital purchase. Here’s the math:

  • Capex: ~£700,000 fully installed
  • Annual self-consumption saving: ~£255,000 year 1, escalating ~3% per year against grid
  • SEG export income: ~£25,500/year on the 12–25% of generation that exports
  • O&M cost: £8–£12 per kW per year — for 1 MW (1,000 kW) that’s ~£10,000/year
  • AIA tax relief: 100% of capex deductible year 1 — saves ~£175,000 in cash tax at 25% corporation tax
  • 25-year cumulative saving (NPV @ 7%): roughly 4–5x the initial capex

IRR over 25 years for a 1 MW (1,000 kW) install lands at 18–28% — well above any board’s hurdle rate. The system runs for 30–35 years with one inverter replacement at year 12–15.

Financing routes for this size

For a £650,000–£750,000 install, the four mainstream financing routes:

  1. Capital purchase + AIA — pay £650,000–£750,000 cash, claim 100% first-year tax relief. Best NPV. Ties up capex.
  2. Asset finance / lease-to-own — spread cost over 5–15 years at 5–8% interest. Cash-flow positive from month 1 at most sites of this size. Take ownership at term-end.
  3. PPA (Power Purchase Agreement) — third party owns and operates the 1 MW (1,000 kW) system, you buy the kWh at 15–30% below grid for 15–25 years. Zero capex, lower 25-year value but no upfront cash.
  4. Green business loan — 100% finance at 4–8% interest, 5–15 years. You own the asset immediately. Loan repayments typically below energy savings from month 1.

See our full factory solar financing guide for side-by-side modelling.

1MW factory solar — FAQs

How much roof do I need for a 1 MW (1,000 kW) solar PV system?

About 6,000 sqm of unobstructed roof for portrait-mounted high-power panels. Slightly more if the roof has chimneys, AHUs, parapets or shading, slightly less for east-west bifacial layouts on flat membrane roofs.

How many solar panels in a 1 MW (1,000 kW) system?

1,840 panels in 2026 (using 545–625W TOPCon n-type modules). The exact count depends on panel wattage selected, roof orientation, and whether you use bifacial or monofacial.

How long does a 1 MW (1,000 kW) install take?

2–5 days physical install for 1 MW (1,000 kW), plus DNO connection (final 4–8 hour outage scheduled at weekend or shutdown). Total project from contract to commissioned: 8–14 weeks (the long pole is G99 grid connection, 6–18 months DNO timeline, which we initiate before contract).

Will a 1 MW (1,000 kW) system cover my factory’s full electricity demand?

For a factory drawing 3,000–5,000 MWh/year, a 1 MW (1,000 kW) system typically offsets 40–65% of annual demand. To get to 100% renewable, combine with a green PPA on a remote solar farm or with a green energy supplier.

Can I get a 1 MW (1,000 kW) solar PV system on PPA with no capex?

Yes — multiple UK PPA providers operate at this size. Standard form: 15–25 year contract at 12–18 p/kWh fixed, with annual escalation tied to RPI or fixed at 1–2%. Day-one positive cash flow vs current 27.69 p/kWh grid retail.

Ready to price up a 1 MW (1,000 kW) system for your factory?

Free desk-based feasibility from your half-hourly meter data within 7 working days. Includes capex, AIA tax relief, NPV, IRR and PPA-vs-capital comparison.