50kW Factory Solar Cost · UK 2026

How Much Does a 50kW Solar System Cost? (UK 2026)

A 50 kW factory solar system costs £45,000–£50,000 fully installed in 2026. That’s £900–£1,000 per kWp. Year-1 saving: £12,000–£16,000. Payback: 4–5 years. Suits small workshop, light engineering, single-shift production sites drawing sub-150 MWh/year.

60-second answer

A 50 kW commercial solar PV system in the UK costs £45,000–£50,000 fully installed in 2026. That typically includes panels, inverters, mounting, structural survey, DNO G99 connection and commissioning. Check whether the quote also includes MCS certification (where it applies) and an insurance-backed warranty.

System size Installed cost Annual output Annual saving Payback 25-yr saving
50 kW£45,000–£50,000~46,000 kWh£12,000–£16,0004–5 yrs~£190,000–£230,000
100 kW factory solar cost£80,000–£90,000~92,000 kWh£22,000–£30,0003.5–4 yrs~£380,000–£450,000
250 kW factory solar cost£187,500–£212,500~230,000 kWh£55,000–£72,0003–4 yrs~£950,000–£1.1m

Figures assume a Mon–Fri daytime load profile and the Q1 2026 industrial grid rate of ~28–30 p/kWh. Get site-exact numbers with our industrial solar panel ROI calculator.

  • Cost per kWp installed: £900–£1,000
  • Number of panels: 90–100 (at 545–625 W each)
  • Roof area required: ~300–360 sqm of unobstructed roof
  • Annual generation: ~46,000 kWh
  • Year-1 saving: £12,000–£16,000 (against an assumed grid rate of 27.69 p/kWh)
  • Simple payback: 4–5 years on capital purchase
  • Tax treatment: 100% AIA in year 1 covers up to £1m of capex — effective post-tax cost £33,750–£37,500. Note: solar is a special-rate asset, so capex above the £1m AIA cap attracts 50% first-year allowance, not full expensing.

Is a 50kW system right for your factory?

A 50 kW array suits sites with roughly 300–360 sqm of clear roof and an annual electricity demand of 80–150 MWh. Use this table to sanity-check fit before you request a quote:

Factory type Typical roof m² Annual kWh use Fit for 50 kW
Micro workshop / small unit150–25030,000–70,000Often oversized — consider 25–30 kW
Light engineering / single-shift production300–45080,000–150,000Ideal fit
Small contract manufacturer500–700150,000–250,000Good — step up to 100 kW factory solar cost
Multi-shift / process plant800+300,000+Undersized — see 250 kW factory solar cost

Self-consumption (using power on site rather than exporting) is what drives payback. A 50 kW system performs best where the factory’s weekday daytime load comfortably exceeds 50 kW for most operating hours.

What’s included in the 50kW price

Every line item that goes into the fully-installed price for a UK commercial solar system this size:

  • Panels (Tier-1 TOPCon n-type, e.g. Jinko Tiger Neo 580W or Trina Vertex 605W) — 35–42% of total cost
  • Inverters (Sungrow / Huawei / SMA / Fronius) — 12–15%
  • Mounting and rails (clamp-fix on standing seam, rail-mount on profiled metal, ballasted on flat) — 8–12%
  • DC and AC cabling, isolators, combiners — 5–7%
  • Labour and project management — 12–18%
  • Scaffolding and access — 3–6%
  • Structural survey, electrical design, PVSyst yield modelling — 3–5%
  • DNO G99 connection (application fee, study, connection works) — 4–8%
  • MCS commissioning, IWA warranty, commissioning certificate — 2–4%

The lower end of the price range applies to easy installs — standing seam metal roof, three-phase supply already in place, no grid reinforcement needed. The upper end applies where any of: roof refurbishment is required, single-phase supply needs upgrading, scaffolding is complex, or DNO grid reinforcement adds £15–£75k.

50kW equipment & install cost breakdown

Indicative £ split on a typical £47,500 fully-installed 50 kW project:

Line item Detail Indicative cost
Panels90–100 × 555–580W Tier-1 TOPCon£16,000–£19,000
Inverter(s)50 kW three-phase string inverter£6,000–£7,500
Mounting & railsRoof-type specific (clamp/rail/ballast)£4,000–£5,500
DC/AC cabling & protectionCable, isolators, combiners, AC works£2,500–£3,500
Scaffold & accessEdge protection / MEWP hire£2,000–£3,500
DNO G99 connectionApplication, study & connection (>50 kWp)£2,500–£5,000
Install labour & PM2–4 day install + project management£6,500–£9,000

A 50 kW system is well above the G98 limit of 3.68 kW per phase, so it needs a full G99 application to your DNO (NGED, UKPN, ENWL, SPEN or Northern Powergrid depending on region) before installation. Ask the installer to initiate this before contract because it is the longest lead item.

Adding battery storage to a 50kW system

Battery storage lets you bank midday surplus and use it during evening shifts or peak-rate windows instead of exporting at the lower SEG rate. For a 50 kW array, a 50–100 kWh commercial battery is the common pairing. Commercial battery storage runs roughly £400–£700 per kWh installed, falling with size.

Battery size Indicative installed cost Best for Payback impact
50 kWh£25,000–£35,000Single-shift sites with evening loadAdds ~1–2 yrs; lifts self-use to 80%+
100 kWh£45,000–£65,000Two-shift sites / peak-shavingAdds ~1.5–3 yrs to blended payback
215 kWh£90,000–£130,000Usually oversized for a 50 kW arrayBetter matched to a 100 kW system

Storage stacks best where you have high spread between peak and off-peak rates, a meaningful evening load, or you want to use solar to peak-shave demand charges. Ask the installer to model battery vs no-battery side by side in the feasibility study.

How a 50kW factory solar system pays back

For a typical UK factory operating Mon–Fri 8am–6pm with the load profile that matches a 50 kW system, the simple payback runs 4–5 years on capital purchase. Here’s the math:

  • Capex: ~£47,500 fully installed
  • Annual self-consumption saving: ~£14,000 year 1, escalating ~3% per year against grid
  • SEG export income: ~£1,400/year on the 12–25% of generation that exports
  • O&M cost: £8–£12 per kW per year — for 50 kW that’s ~£500/year
  • AIA tax relief: 100% of capex deductible year 1 — saves ~£11,875 in cash tax at 25% corporation tax
  • 25-year cumulative saving (NPV @ 7%): roughly 4–5x the initial capex

IRR over 25 years for a 50 kW install lands at 18–28% — well above any board’s hurdle rate. The system runs for 30–35 years with one inverter replacement at year 12–15.

Financing routes for this size

For a £45,000–£50,000 install, the four mainstream financing routes:

  1. Capital purchase + AIA — pay £45,000–£50,000 cash, claim 100% first-year tax relief. Best NPV. Ties up capex.
  2. Asset finance / lease-to-own — the cost is spread over a fixed term and you take ownership at the end. You can normally claim the AIA from the start.
  3. PPA (Power Purchase Agreement) — third party owns and operates the 50 kW system, you buy the kWh at 15–30% below grid for 15–25 years. Zero capex, lower 25-year value but no upfront cash.
  4. Green business loan — a lender advances the cost and you own the asset immediately, so the AIA is yours. Compare the total amount repayable with your modelled saving.

See our full factory solar financing guide for side-by-side modelling.

50kW factory solar — FAQs

How much roof do I need for a 50 kW solar PV system?

About 300–360 sqm of unobstructed roof for portrait-mounted high-power panels. Slightly more if the roof has chimneys, AHUs, parapets or shading, slightly less for east-west bifacial layouts on flat membrane roofs.

How many solar panels in a 50 kW system?

90–100 panels in 2026 (using 545–625W TOPCon n-type modules). The exact count depends on panel wattage selected, roof orientation, and whether you use bifacial or monofacial.

How long does a 50 kW install take?

2–5 days physical install for 50 kW, plus DNO connection (final 4–8 hour outage scheduled at weekend or shutdown). Total project from contract to commissioned: 8–14 weeks (the long pole is G99 grid connection, 6–18 months DNO timeline, which the installer should initiate before contract).

Will a 50 kW system cover my factory’s full electricity demand?

For a factory drawing sub-150 MWh/year, a 50 kW system typically offsets 40–65% of annual demand. To get to 100% renewable, combine with a green PPA on a remote solar farm or with a green energy supplier.

Can I get a 50 kW solar PV system on PPA with no capex?

Yes — multiple UK PPA providers operate at this size. Standard form: 15–25 year contract at 12–18 p/kWh fixed, with annual escalation tied to RPI or fixed at 1–2%. Day-one positive cash flow vs an assumed 27.69 p/kWh grid price.

Ready to price up a 50 kW system for your factory?

Request quotes, then ask the installer for a desk-based feasibility from your half-hourly meter data. It can cover capex, AIA tax relief, NPV, IRR and a PPA-vs-capital comparison.

Get a Free 50kW Factory Solar Quote

If load-shifting matters on your site, the battery storage guide for factories explains when storage pays.

Send your site details

Tell us about your factory and we reply by email. A quote request carries no obligation.