Medway and Kent represent a vital hub of UK manufacturing, with a strong heritage and growing focus on sustainable energy solutions. This guide covers the grid, roof and incentive points that matter for a factory solar project in the area.

Dockyard Heritage Thames Gateway M2/A2 Access Maritime Engineering

Key Industries in the Area

Engineering

Maritime

Logistics

Manufacturing

Local context: Ask each installer whether they have worked with Kent manufacturers and can tailor a solar system to your specific industry needs.

Medway & Kent: Worked Examples

Illustrative worked examples for typical facilities in the region, modelled on 2026 UK cost and yield benchmarks

Engineering Medway

Medway Engineering Facility

Worked example for a typical engineering facility of this scale

System Size: 320kW
Annual Savings: £64,000
Payback Period: 3.4 years
CO2 Reduction: 133 tonnes/year
Maritime Medway

Regional Maritime Works

Precision maritime facility with modern production capabilities

System Size: 185kW
Annual Savings: £38,000
Payback Period: 3.6 years
CO2 Reduction: 77 tonnes/year
Logistics Medway

Medway Distribution Centre

Logistics hub serving Kent and beyond

System Size: 450kW
Annual Savings: £88,000
Payback Period: 3.2 years
CO2 Reduction: 186 tonnes/year

Medway Factory Solar FAQs

Common questions about solar installation in Medway & Kent

How much does factory solar installation cost in Medway?

Medway factory solar installations typically cost £740-£1,000 per kW installed. With the Annual Investment Allowance (AIA), most Kent factories see payback periods of 3.0-3.8 years.

Is Medway suitable for solar power generation?

Yes, Medway receives approximately 1030 kWh/m2 of solar irradiance annually - sufficient for excellent returns. Modern panels work efficiently year-round in UK conditions.

Which industries are most common in Medway?

Medway's manufacturing base includes Engineering, Maritime, Logistics. Each sector has its own requirements — see the sector guides below.

Get Your Medway Factory Solar Quote

Send your site details for your Medway or Kent manufacturing facility and we reply by email.

Grid Connection & DNO — Medway

Distribution Network Operator
UK Power Networks (SPN)
DNO code: UKPN-SPN
G99 required above 3.68 kW per phase (16 A)
Typical G99 Timeline
8–12 weeks
Application to permission (subject to reinforcement)
Budget £1,500–£8,000+ in connection fees
Solar Irradiance
1050 kWh/kWp/yr
Estimated annual yield — above UK average
Source: PVGIS / ERA5 typical met year

Related Guides for Medway Manufacturers

Most Medway manufacturers start by shortlisting solar panels for business and benchmarking commercial solar panel cost; the linked guides set out the figures to compare.

Solar ROI Benchmarks for Medway Manufacturers

Medway's industrial and logistics cluster — Chatham Docks, Kingsnorth Industrial Estate, Estuary Services Zone — represents a major solar opportunity; UK Power Networks SPN grid with excellent Thames Estuary irradiance.

System Size Installed Cost Annual Saving Payback Period CO2 Saved/yr
100 kWp £72,514 £21,630/yr 3.4 years 24 tonnes
350 kWp £197,400 £75,704/yr 2.6 years 86 tonnes
1 MW £473,357 £216,300/yr 2.2 years 245 tonnes
Grid Tariff
26p/kWh
Typical industrial half-hourly rate, South East 2026
SEG Export Rate
12p/kWh
Smart Export Guarantee, best available tariff
Annual Investment Allowance
100% first year
On up to £1m of spend; solar is special-rate plant, so full expensing does not apply

Nearby Location Guides

Guides for nearby industrial locations

Medway industrial solar — the local picture

For UK industrial electricity at 27.69 p/kWh (illustrative: use your own tariff), a Medway factory drawing 800 MWh/year is paying ~£220,000/year for grid power. A 250 kW rooftop solar PV system on a typical factory roof will offset 35–55% of that, saving ~£58,000 in year 1 with full Annual Investment Allowance tax relief in year 1.

Medway factory solar by industry

Whatever sector your Medway factory operates in, the sector guides below cover the specifics.

Medway factory solar — expanded FAQ

How long does a Medway factory solar install take?

From contract signature to commissioned system: 8–14 weeks for systems up to 500 kW, 12–16 weeks for 1 MW+. The longest item is the G99 grid connection (6–18 months DNO timeline) which your installer should initiate before contract. Physical install on roof: 2–5 days for 100–500 kW, 5–10 days for 1 MW+. Installers typically schedule the work around your shutdown windows.

What grants are available for Medway manufacturers?

The Industrial Energy Transformation Fund (England, Wales and Northern Ireland) closed in July 2025 with no successor fund planned and never funded solar PV, so the Annual Investment Allowance (AIA) — 100% of capex up to £1m in year 1 — is the main relief. Locally, ask your local growth hub or combined authority about current regional business support.

Will I need planning permission in Medway?

In England, rooftop solar PV on non-domestic buildings is usually permitted development (Part 14, Class J of the GPDO) up to 1 MW, subject to conditions; Scotland, Wales and Northern Ireland have their own rules. Listed buildings, conservation areas and PV projecting more than 200mm above the roof need full planning. Your installer should confirm planning status before quoting.

What roof types suit factory solar in Medway?

All commercial roof types: standing seam metal (clamp-fix, no penetrations), profiled / corrugated metal (rail-mount), flat membrane (ballasted), single-ply EPDM (mechanically fixed). Asbestos-cement roofs cannot be retrofitted — refurbishment to a modern membrane is required first. See our roof weight load guide for structural requirements per roof type.

How do I get a quote for my Medway site?

Three steps. (1) Submit a quote request with your annual electricity spend and roof type. (2) We reply by email. (3) You can then ask any installer you approach to model your half-hourly meter data and roof, survey the site and send a proposal. A quote request carries no obligation.