50% First-Year Allowance + AIA tax relief on factory solar — book a desk feasibility before April 2026
Call now

Factory Solar Panel Installation
Crawley & West Sussex

Professional solar panel installation for Crawley and West Sussex factories. Gatwick corridor specialists serving the aviation and technology manufacturing hub.

11+ Gatwick Corridor Installations
Aviation and tech manufacturing hub
UK industrial solar PV array on factory rooftop

Crawley Manufacturing Excellence

Crawley and West Sussex represent a vital hub of UK manufacturing, with a strong heritage and growing focus on sustainable energy solutions. Our team has extensive experience serving the region's diverse industrial base.

£2.5B
Manufacturing GVA
25K
Manufacturing Jobs
24+
Solar Installations
Gatwick Airport Hub Manor Royal Industrial M23 Corridor Aviation Services

Key Industries We Serve

Aviation

Aerospace

Pharmaceuticals

Logistics

Local Expertise: Our Crawley team understands the unique requirements of West Sussex manufacturers and can provide tailored solar solutions for your specific industry needs.

Crawley & West Sussex Success Stories

Real results from manufacturers across the region

Aviation Crawley

Crawley Aviation Facility

Leading aviation facility serving regional and national markets

System Size: 320kW
Annual Savings: £64,000
Payback Period: 3.4 years
CO2 Reduction: 133 tonnes/year
"Solar has transformed our energy costs and helped us meet sustainability targets for our Crawley operation."
- Operations Director
Aerospace Crawley

Regional Aerospace Works

Precision aerospace facility with modern production capabilities

System Size: 185kW
Annual Savings: £38,000
Payback Period: 3.6 years
CO2 Reduction: 77 tonnes/year
"The installation was seamless and the results have exceeded our expectations for energy savings."
- Managing Director
Pharmaceuticals Crawley

Crawley Distribution Centre

Pharmaceuticals hub serving West Sussex and beyond

System Size: 450kW
Annual Savings: £88,000
Payback Period: 3.2 years
CO2 Reduction: 186 tonnes/year
"Our large roof space was ideal for solar. It now powers our operations during peak demand hours."
- Site Manager

Crawley Factory Solar FAQs

Common questions about solar installation in Crawley & West Sussex

How much does factory solar installation cost in Crawley?

Crawley factory solar installations typically cost £760-£1,040 per kW installed. With local grants and Annual Investment Allowance (AIA), most West Sussex factories see payback periods of 3.0-3.8 years.

What areas in Crawley and West Sussex do you cover?

We cover all Crawley and West Sussex industrial areas including business parks, industrial estates, and manufacturing zones. Our regional team has excellent access to all major road networks.

Is Crawley suitable for solar power generation?

Yes, Crawley receives approximately 1045 kWh/m2 of solar irradiance annually - sufficient for excellent returns. Modern panels work efficiently year-round in UK conditions.

What industries do you serve in Crawley?

We serve Crawley's diverse manufacturing base including Aviation, Aerospace, Pharmaceuticals. Our team understands the specific requirements of each sector and tailors installations accordingly.

What grants are available for Crawley manufacturers?

Crawley manufacturers can access Annual Investment Allowance (AIA), Regional Development Grants. Combined support can significantly reduce installation costs.

Get Your Crawley Factory Solar Quote

Free site survey and quote for your Crawley or West Sussex manufacturing facility.

Grid Connection & DNO — Crawley

Distribution Network Operator
UK Power Networks (SPN)
DNO code: UKPN-SPN
G99 required for systems >50 kWp
Typical G99 Timeline
8–12 weeks
Application to permission (subject to reinforcement)
Budget £1,500–£8,000+ in connection fees
Solar Irradiance
1045 kWh/kWp/yr
Estimated annual yield — above UK average
Source: PVGIS / ERA5 typical met year

Solar ROI Benchmarks for Crawley Manufacturers

Crawley's proximity to Gatwick drives substantial logistics, cold chain and engineering manufacturing; Stephenson Way and Manor Royal Business District host energy-intensive facilities with UK Power Networks SPN grid access.

System Size Installed Cost Annual Saving Payback Period CO2 Saved/yr
100 kWp £72,477 £21,527/yr 3.4 years 24 tonnes
350 kWp £197,299 £75,344/yr 2.6 years 85 tonnes
1 MW £473,117 £215,270/yr 2.2 years 243 tonnes
Grid Tariff
26p/kWh
Typical industrial half-hourly rate, South East 2026
SEG Export Rate
12p/kWh
Smart Export Guarantee, best available tariff
Full Expensing
100% first year
Capital allowance on qualifying solar plant

Nearby Service Areas

We also serve industrial facilities in these nearby locations

Our Installation Partners & Related Resources

We work with trusted MCS certified installers across the UK and provide resources for every commercial solar need.

Our SEO Partner: SEO Dons — Specialist SEO for Solar & Electrical Companies

Crawley industrial solar — the local picture

Crawley is part of the UK, with .

Crawley Council operates an active climate plan.

Permitted Development Rights cover most rooftop PV across Crawley.

For UK industrial electricity at 27.69 p/kWh (Q1 2026 Ofgem), a Crawley factory drawing 800 MWh/year is paying ~£220,000/year for grid power. A 250 kW rooftop solar PV system on a typical factory roof will offset 35–55% of that, saving ~£58,000 in year 1 with full Annual Investment Allowance tax relief in year 1.

Industrial estates we serve in Crawley

All major industrial estates, business parks and trading estates across Crawley and the surrounding area.

Crawley hosts a number of industrial estates, business parks and trading estates suitable for commercial-scale solar PV. We cover the full area.

Crawley factory solar by industry

Whatever sector your Crawley factory operates in, we have a sector-specific design.

Crawley factory solar — expanded FAQ

How long does a Crawley factory solar install take?

From contract signature to commissioned system: 8–14 weeks for systems up to 500 kW, 12–16 weeks for 1 MW+. The longest item is the G99 grid connection (6–18 months DNO timeline) which we initiate before contract. Physical install on roof: 2–5 days for 100–500 kW, 5–10 days for 1 MW+. We schedule installation around your shutdown windows.

What grants are available for Crawley manufacturers?

Nationally: Industrial Energy Transformation Fund (IETF) Phase 3 covers 30–50% of qualifying decarbonisation costs. Annual Investment Allowance (AIA) covers 100% of capex up to £1m in year 1. Locally, check current regional business support programmes — we map every available route as part of the free feasibility study.

Will I need planning permission in Crawley?

In most cases no — Permitted Development Rights (Class A Part 14, GPDO 2015) cover rooftop PV on industrial buildings under 1 MW. Listed buildings, conservation areas and PV projecting more than 200mm above the roof require full planning. We confirm planning status during the desk feasibility before any quote.

What roof types do you cover in Crawley?

All commercial roof types: standing seam metal (clamp-fix, no penetrations), profiled / corrugated metal (rail-mount), flat membrane (ballasted), single-ply EPDM (mechanically fixed). Asbestos-cement roofs cannot be retrofitted — refurbishment to a modern membrane is required first. See our roof weight load guide for structural requirements per roof type.

How do I get a fixed-price quote for my Crawley site?

Three steps. (1) Submit a free quote request with your annual electricity spend and roof type. (2) We pull half-hourly meter data and run PVSyst yield modelling. (3) On-site survey and fixed-price proposal within 7–10 working days. No obligation, no hard-sell — we’ll tell you honestly if your site doesn’t suit solar.