50% First-Year Allowance + AIA tax relief on factory solar — book a desk feasibility before April 2026
Call now
UK 2026 Buyer's Guide

Factory Solar Wales — Industrial Solar PV Across Cymru

Industrial solar PV across Wales — covering Cardiff, Swansea, Newport, Wrexham and Port Talbot. Specialist factory solar installation across the Wales manufacturing base, with regional grant guidance, DNO context and free fixed-price quotes.

Why Wales factories are switching to solar

Wales hosts a major share of UK manufacturing and logistics. Industrial electricity now costs ~28 p/kWh (Q1 2026 Ofgem). Most factories across Cardiff, Swansea, Newport, Wrexham and Port Talbot face EPC band B by 2030 (MEES regulation), Tier-1 customer Scope 2 disclosure (JLR, Diageo, Tesco, M&S), and 40–70% energy savings on offer through rooftop PV. Typical Wales factory ROI: 3–5 years on capital purchase, day-one positive cash flow on PPA.

Wales grants and council support

Welsh Government runs the SMART Cymru innovation grant and Business Wales Energy Efficiency Loan (£10k–£200k at 0% interest). The 2030 net-zero public-sector target across Wales pushes private-sector decarbonisation. Welsh Industrial Energy Transformation Fund (WIETF) covers 30–50% of qualifying decarbonisation costs.

Wales DNO grid connection

Wales is served by SP Manweb (in the north) and Western Power Distribution (in the south). G99 timelines are 6–12 months — faster than most of England. The South Wales industrial corridor (M4) has good DNO capacity, North Wales (Wrexham, Deeside) similar.

Wales industrial estates we serve

We deliver factory solar PV across all major Wales industrial estates, distribution corridors and manufacturing parks — including industrial estates in Cardiff, Swansea, Newport, Wrexham and Port Talbot and the wider regional supply chain.

How to start

Three steps: (1) Submit a free quote request with your annual electricity spend and roof type. (2) Receive a free desk-based feasibility from your half-hourly meter data within 7 working days. (3) On-site survey and fixed-price proposal — with NPV, IRR and 25-year cash flow.