Comparison Guide · UK 2026

Factory Solar vs Wind — Which Is Right for UK Manufacturers?

Solar wins on rooftop economics, wind wins on land-rich rural sites with high mean wind speed.

The decisive factor: do you have suitable land?

Solar PV needs roof or open paved area. Wind needs open rural land with mean wind speed > 6 m/s. For 90% of UK factories — on industrial estates without surrounding open land — the choice is solar by default. Wind is realistic only for rural manufacturing sites with adjacent farmland the operator owns or can lease.

Side-by-side economics

FactorSolar PVWind
Capex per kW£700–£900/kWp£1,300–£2,200/kW
Capacity factor (UK)10–12%22–38%
Land useExisting roof0.5–1 acre per 800 kW turbine + setback
Planning routePermitted DevelopmentFull planning + EIA + community consultation
Generation profileDaytime, peaks summerAll hours, peaks winter
Best fit90% of UK factoriesRural sites with land

When wind beats solar

Wind beats solar on three site types: (1) rural food production with adjacent farmland, (2) sites in north-west Scotland, west Wales or coastal Northumberland with mean wind speed > 7 m/s, (3) sites with high winter electricity demand (cold stores, glasshouses). Most UK sites where wind makes sense are also good for combined wind + solar deployment.

Factory Solar vs Wind — Which Is Right for UK Manufacturers? — FAQs

What changes if my factory is in Scotland or Wales?

Mainly DNO connection timelines (faster in Scotland) and regional support (such as the Welsh Government Energy Efficiency Loan; Scotland's Industrial Energy Transformation Fund has closed all its calls). Core economics unchanged.

Is the answer different for a tenant vs owner-occupier?

See our dedicated tenant vs landlord guide for full ownership-model analysis.

How do I get an honest comparison for my specific site?

Submit a quote request with your annual electricity spend and roof type, then ask the installers who respond to model both options against your half-hourly meter data and share the side-by-side NPV/IRR/payback.

Want a side-by-side comparison for your site?

Request matched quotes and ask installers to model the case against your actual half-hourly meter data, not industry averages.

Get a Free Comparison