50% First-Year Allowance + AIA tax relief on factory solar — book a desk feasibility before April 2026
Call now
Comparison Guide · UK 2026

Factory Solar vs Wind — Which Is Right for UK Manufacturers?

Solar wins on rooftop economics, wind wins on land-rich rural sites with high mean wind speed.

The decisive factor: do you have suitable land?

Solar PV needs roof or open paved area. Wind needs open rural land with mean wind speed > 6 m/s. For 90% of UK factories — on industrial estates without surrounding open land — the choice is solar by default. Wind is realistic only for rural manufacturing sites with adjacent farmland the operator owns or can lease.

Side-by-side economics

FactorSolar PVWind
Capex per kW£700–£900/kWp£1,300–£2,200/kW
Capacity factor (UK)10–12%22–38%
Land useExisting roof0.5–1 acre per 800 kW turbine + setback
Planning routePermitted DevelopmentFull planning + EIA + community consultation
Generation profileDaytime, peaks summerAll hours, peaks winter
Best fit90% of UK factoriesRural sites with land

When wind beats solar

Wind beats solar on three site types: (1) rural food production with adjacent farmland, (2) sites in north-west Scotland, west Wales or coastal Northumberland with mean wind speed > 7 m/s, (3) sites with high winter electricity demand (cold stores, glasshouses). Most UK sites where wind makes sense are also good for combined wind + solar deployment.

Factory Solar vs Wind — Which Is Right for UK Manufacturers? — FAQs

What changes if my factory is in Scotland or Wales?

Mainly DNO connection timelines (faster in Scotland) and grant programmes (Welsh Government Energy Efficiency Loan, Scottish Industrial Energy Transformation Fund). Core economics unchanged.

Is the answer different for a tenant vs owner-occupier?

See our dedicated tenant vs landlord guide for full ownership-model analysis.

How do I get an honest comparison for my specific site?

Submit a quote request with your annual electricity spend and roof type. We model both options against your half-hourly meter data and share the side-by-side NPV/IRR/payback.

Want a side-by-side comparison for your site?

Free desk-based feasibility within 7 working days. Modelled against your actual half-hourly meter data, not industry averages.

Get a Free Comparison